JIALI automated production equipment

تولید و کیفیت

Process control from raw material to packed product

Repeatable manufacturing, documented checks and continuous improvement support dependable supply.

تولید لنت ترمز

هشت مرحله تولید کنترل‌شده

The process is designed to control material uniformity, bonding, dimensions, finish and traceability.

01

کنترل مواد اولیه

Incoming materials are identified and checked before release.

02

توزین فرمول

Materials are weighed to controlled formulation requirements.

03

مخلوط‌سازی

Specified mixing cycles support distribution consistency.

04

پرس گرم

Proportional pressure and temperature form the friction block.

05

عملیات حرارتی

Controlled curing stabilises material performance.

06

سنگ‌زنی و پخ‌زنی

Precision finishing controls thickness, slot and edge geometry.

07

پوشش‌دهی و مونتاژ

Back plates, shims and hardware are finished and assembled.

08

بازرسی و بسته‌بندی

Final checks, marking and traceable export packaging.

تجهیزات کارخانه

توان تولیدی قابل مشاهده

Surface inspection line
Surface inspection
Automated processing
Automated processing
Hot press production
Hot press production
Quality inspection
Quality inspection
Production handling
Production handling
Warehouse management
Warehouse management

چارچوب کنترل کیفیت

Checks focused on what the market experiences

Quality is evaluated through material, process and finished-product controls. Project-specific test documentation can be discussed during supplier qualification.

MaterialIdentity, batch and formula control
DimensionsThickness, profile and hardware fit
BondingBacking plate preparation and adhesion
FrictionCoefficient stability and temperature behaviour
NVHNoise, vibration and harshness considerations
TraceabilityProduct marking, lot and packaging records
Brake pad quality inspection

ارزیابی تأمین‌کننده

Need factory or quality documentation?

Tell us the requirements for your market and purchasing programme.

تماس با تیم ما